The pipeline bends are being installed for a housing development in Hele Park and are protected with Winn & Coales Denso Protal 7300.
The development is based on a 800mtr diversion of a 500mm high pressure pipeline. The job involves two 5-way stopples with multiple drillings under pressure and line stopping.
Denso Protal 7000 is a fast curing two-pack epoxy coating for protection of buried pipelines. It is applied by brush or trowel. It can be applied up to 1mm in one coat without slumping.